3.2.2.3: Mainframe
Jump to navigation
Jump to search
1. Risk: Controls provide reasonable assurance that the systems are appropriately tested and validated prior to being placed into production processes, and associated controls operate as intended and support financial reporting requirements.
- a. SOX.5.4 A testing strategy is developed and followed for all significant changes in applications and infrastructure technology, which addresses unit, system, integration and user-acceptance-level testing so that deployed systems operate as intended.
--Mdpeters 09:46, 23 June 2006 (EDT)