SOX.1.3:: Difference between revisions

From HORSE - Holistic Operational Readiness Security Evaluation.
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 2: Line 2:
[[Image:Key-control.jpg]]
[[Image:Key-control.jpg]]
<br>
<br>
::'''1. Risk: The transfer of programs into the live environment may not be appropriately controlled.'''<br>
::'''1. Risk: The transfer of programs into the live environment is not appropriately controlled.'''<br>
:::a. [[SOX.1.3:|'''SOX.1.3''']] IT management implements system software that does not jeopardize the security of the data and programs being stored on the system.  
:::a. [[SOX.1.3:|'''SOX.1.3''']] IT management implements system software that does not jeopardize the security of the data and programs being stored on the system.  
<br>
<br>
Line 12: Line 12:
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
1. Determine that a risk assessment of the potential impact of changes to system software is performed.
1. Determine that a risk assessment of the potential impact of changes to system software is performed.
<br>
2. Review procedures to test changes to system software in a development environment before they are
2. Review procedures to test changes to system software in a development environment before they are
applied to production.  
applied to production.  
 
<br>
3. Verify that backout procedures exist.  
3. Verify that backout procedures exist.  
</blockquote>
</blockquote>
 
<br>
'''Testing Frequency'''
'''Testing Frequency'''
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<blockquote style="background: white; border: 1px solid black; padding: 1em;">

Latest revision as of 19:58, 23 June 2006


1. Risk: The transfer of programs into the live environment is not appropriately controlled.
a. SOX.1.3 IT management implements system software that does not jeopardize the security of the data and programs being stored on the system.





Testing Procedures

1. Determine that a risk assessment of the potential impact of changes to system software is performed.
2. Review procedures to test changes to system software in a development environment before they are applied to production.
3. Verify that backout procedures exist.


Testing Frequency

Annually

Evidence Archive Location

Insert hyperlink or location of evidence archive.

Control Stewards Process Narrative

Provide control steward commentary indicating the formal methodology in place.


Control Steward – Jane Manager

Process Illustration

Replace this test by inserting a process diagram, flowchart or other visual representation to illustrate the process narrative as necessary. Include a brief description of the process illustration.

Control Status and Auditors Commentary

The control is effective.


File:Greenlock.jpg

Status is acceptable.

Control Exception Commentary

Status is acceptable.

Remediation Plan

Remediation is not required at this time.