SOX.1.1.1:: Difference between revisions

From HORSE - Holistic Operational Readiness Security Evaluation.
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:
'''Testing Procedures'''
'''Testing Procedures'''
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
Obtain a copy of the user control file from the system and verify that there are no duplicate system accounts.<br>
Obtain a copy of the organizations SDLC methodology. Review the methodology to determine if it addresses security, availability, and processing integrity.<br>
<br>
<br>
An example of this might be one of the following:<br>
Consider whether there are appropriate steps to determine if these requirements are considered throughout the development or acquisition life cycle, e.g., security and availability and processing integrity should be considered during the requirements phase.
<br>
*Solaris Unix: etc/passwd<br>
*AIX Unix: etc/passwd<br>
*Linux Unix: etc/passwd<br>
<br>
<br>
</blockquote>
</blockquote>
Line 20: Line 16:
'''Testing Frequency'''
'''Testing Frequency'''
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
Quarterly validation of all systems within scope.
This should be an integral part of development in house. During the planning stages of development security, availability, and processing integrity must be considered.
<br>
<br>
</blockquote>
</blockquote>
Line 32: Line 28:
'''Control Stewards Process Narrative'''
'''Control Stewards Process Narrative'''
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<p><font color=#008000>The AIX operating system prevents the addition of duplicate Ids. Furthermore, the regular review of administrator IDs listed above serves as a backstop for this control.</font></p>
<p><font color=#008000>Provide control steward commentary indicating the formal methodology in place.</font></p>


<br>
<br>
'''Control Steward – Steve Somebody'''
'''Control Steward – Jane Manager'''
<br>
<br>
</blockquote>
</blockquote>
Line 47: Line 43:
'''Control Status and Auditors Commentary'''
'''Control Status and Auditors Commentary'''
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<blockquote style="background: white; border: 1px solid black; padding: 1em;">
<p><font color=#008000>The control is effective. It is technically impossible to establish identical user accounts on a UNIX operating system.</font></p>
<p><font color=#008000>The control is effective.</font></p>
<br>
<br>
[[Image:greenlock.jpg]]<br>
[[Image:greenlock.jpg]]<br>

Revision as of 13:18, 21 June 2006


1. Risk: Information security and business requirements may be compromised. Inaccurate results are produced.
a. SOX.1.1.1 A formal, documented systems development methodology should be established and implemented by management. This systems development life cycle (SDLC) describes the stages involved in information system development projects, from an initial feasibility study through maintenance of the completed application. Verify that security, availability, and process integrity requirements are included.


Testing Procedures

Obtain a copy of the organizations SDLC methodology. Review the methodology to determine if it addresses security, availability, and processing integrity.

Consider whether there are appropriate steps to determine if these requirements are considered throughout the development or acquisition life cycle, e.g., security and availability and processing integrity should be considered during the requirements phase.

Testing Frequency

This should be an integral part of development in house. During the planning stages of development security, availability, and processing integrity must be considered.

Evidence Archive Location

Insert hyperlink or location of evidence archive.

Control Stewards Process Narrative

Provide control steward commentary indicating the formal methodology in place.


Control Steward – Jane Manager

Process Illustration

Replace this test by inserting a process diagram, flowchart or other visual representation to illustrate the process narrative as necessary. Include a brief description of the process illustration.

Control Status and Auditors Commentary

The control is effective.


File:Greenlock.jpg

Status is acceptable.

Control Exception Commentary

Status is acceptable.

Remediation Plan

Remediation is not required at this time.