PCI-1.1.2:: Difference between revisions

From HORSE - Holistic Operational Readiness Security Evaluation.
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
<blockquote style="background: #C8CDC7; padding: 1em; margin-left: 0.5em;">
<blockquote style="background: #C8CDC7; padding: 1em; margin-left: 0.5em;">
<br>
<br>
:'''Establish firewall configuration standards that include:'''<br>
:'''Current network diagram with all connections to cardholder data, including any wireless networks.'''<br>
<br>
<br>
:* Obtain and inspect the firewall configuration standards and other documentation specified below to obtain evidence the standards are complete. Also obtain a copy of the following documentation:
:* PCI-1.1.2.a: Verify that a current network diagram (for example, one that shows cardholder data flows over the network) exists and that it documents all connections to cardholder data, including any wireless networks.<br>
<br>
<br>
::'''PCI-1.1.2:''' Obtain and examine a current network diagram and verify that it documents all connections to cardholder data, including any wireless networks, and that the diagram is kept current.
:* PCI-1.1.2.b: Verify that the diagram is kept current.<br>
<br>
<br>
</blockquote>
</blockquote>

Revision as of 12:22, 16 June 2010


Current network diagram with all connections to cardholder data, including any wireless networks.


  • PCI-1.1.2.a: Verify that a current network diagram (for example, one that shows cardholder data flows over the network) exists and that it documents all connections to cardholder data, including any wireless networks.


  • PCI-1.1.2.b: Verify that the diagram is kept current.



Testing Procedures

Insert testing guidance here.

Testing Frequency

Describe testing frequency here.

Evidence Archive Location

Insert hyperlink or location of evidence archive.

Control Stewards Process Narrative

Provide control steward commentary indicating the formal methodology in place.


Control Steward – Jon Doe

Process Illustration

Replace this test by inserting a process diagram, flowchart or other visual representation to illustrate the process narrative as necessary. Include a brief description of the process illustration.

Control Status and Auditors Commentary

The control is effective.


File:Greenlock.jpg

Status is acceptable.

Control Exception Commentary

Status is acceptable.

Remediation Plan

Remediation is not required at this time.


--Mdpeters 16:16, 2 March 2007 (EST)