DS12.5:

From HORSE - Holistic Operational Readiness Security Evaluation.
Revision as of 18:31, 5 May 2006 by Tdspain (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

DS 12.5 Physical Facilities Management

Control Objective:
Manage facilities, including power and communications equipment, in line with laws and regulations, technical and business requirements, vendor specifications, and health and safety guidelines.

Applicability:

Sarbanes-Oxley
HIPAA
GLBA
PCI
FISMA
NIST SP 800-66
Ditscap
Control Exception
User Defined


Risk Association Control Activities:

1. Risk: Computer equipment may be compromised by accidental damage.
a. SOX.2.6.1: Physical storage of computer equipment should be appropriately protected to prevent the risk of accidental damage (e.g., fire, flood, smoke, water, dust, vibration, chemicals, and radiation).


Process Narrative
Insert a description of the process narration that is applicable to the existing control statement this narrative refers to.

Process Illustration
Insert a process diagram, flowchart or other visual representation here to illustrate the process narrative.

File:Someimage.jpg

Control Commentary
Insert a description of the control that is applicable to the existing control statement this commentary refers to.

Control Exception Commentary
Insert a description of the control exception that is applicable to the existing control statement this commentary refers to.

Evidence Archive Location
Insert Evidence Description Here.

Control Status and Auditors Commentary
Describe the condition of the applicable control and its effectiveness. Set the color icon to a redlock.jpg, yellowlock.jpg or greenlock.jpg.

File:Redlock.jpg

Remediation Plan
Insert remediation plan, applicability, or any information that indicates what needs to be done.

Supplemental Information: