PCI-1.1.1:: Difference between revisions

From HORSE - Holistic Operational Readiness Security Evaluation.
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
<blockquote style="background: #C8CDC7; padding: 1em; margin-left: 0.5em;">
<blockquote style="background: #C8CDC7; padding: 1em; margin-left: 0.5em;">
<br>
<br>
:'''Establish firewall configuration standards that include:'''<br>
:'''A formal process for approving and testing all network connections and changes to the firewall and router configurations.'''<br>
<br>
<br>
:* Obtain and inspect the firewall configuration standards and other documentation specified below to obtain evidence the standards are complete. Also obtain a copy of the following documentation:
:* Verify that there is a formal process for testing and approval of all network connections and changes to firewall and router configurations.
<br>
::'''PCI-1.1.1:''' Obtain and examine the firewall configuration standards and verify a formal process is in place for all changes, including management approval and testing for all changes to external network connections and the firewall configuration.
<br>
<br>
</blockquote>
</blockquote>

Latest revision as of 12:19, 16 June 2010


A formal process for approving and testing all network connections and changes to the firewall and router configurations.


  • Verify that there is a formal process for testing and approval of all network connections and changes to firewall and router configurations.



Testing Procedures

Insert testing guidance here.

Testing Frequency

Describe testing frequency here.

Evidence Archive Location

Insert hyperlink or location of evidence archive.

Control Stewards Process Narrative

Provide control steward commentary indicating the formal methodology in place.


Control Steward – Jon Doe

Process Illustration

Replace this test by inserting a process diagram, flowchart or other visual representation to illustrate the process narrative as necessary. Include a brief description of the process illustration.

Control Status and Auditors Commentary

The control is effective.


File:Greenlock.jpg

Status is acceptable.

Control Exception Commentary

Status is acceptable.

Remediation Plan

Remediation is not required at this time.


--Mdpeters 16:15, 2 March 2007 (EST)