PCI-1.1.3:: Difference between revisions

From HORSE - Holistic Operational Readiness Security Evaluation.
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 42: Line 42:
<p><font color=#008000>The control is effective.</font></p>
<p><font color=#008000>The control is effective.</font></p>
<br>
<br>
[[Image:greenlock.jpg]]<br>
[[Image:greenlock.png]]<br>
<br>
<br>
Status is acceptable.
Status is acceptable.

Latest revision as of 10:55, 4 July 2015


Requirements for a firewall at each Internet connection and between any demilitarized zone (DMZ) and the internal network zone.


  • Verify that firewall configuration standards include requirements for a firewall at each Internet connection and between any DMZ and the internal network zone. Verify that the current network diagram is consistent with the firewall configuration standards.



Testing Procedures

Insert testing guidance here.

Testing Frequency

Describe testing frequency here.

Evidence Archive Location

Insert hyperlink or location of evidence archive.

Control Stewards Process Narrative

Provide control steward commentary indicating the formal methodology in place.


Control Steward – Jon Doe

Process Illustration

Replace this test by inserting a process diagram, flowchart or other visual representation to illustrate the process narrative as necessary. Include a brief description of the process illustration.

Control Status and Auditors Commentary

The control is effective.




Status is acceptable.

Control Exception Commentary

Status is acceptable.

Remediation Plan

Remediation is not required at this time.


--Mdpeters 16:17, 2 March 2007 (EST)