SOX.1.3:: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
<blockquote style="background: #C8CDC7; padding: 1em; margin-left: 0.5em;"> | <blockquote style="background: #C8CDC7; padding: 1em; margin-left: 0.5em;"> | ||
[[Image:Key-control.jpg]]<br> | [[Image:Key-control.jpg]] | ||
::'''Risk: | <br> | ||
:::a. SOX.3.1 | ::'''1. Risk: The transfer of programs into the live environment may not be appropriately controlled.'''<br> | ||
:::a. [[SOX.1.3:|'''SOX.1.3''']] The transfer of programs into the live environment should be | |||
appropriately controlled.<br> | |||
<br> | <br> | ||
<br> | <br> |
Revision as of 19:45, 23 June 2006
- 1. Risk: The transfer of programs into the live environment may not be appropriately controlled.
- a. SOX.1.3 The transfer of programs into the live environment should be
appropriately controlled.
Testing Procedures
1. Determine that a risk assessment of the potential impact of changes to system software is performed.
2. Review procedures to test changes to system software in a development environment before they are applied to production.
3. Verify that backout procedures exist.
Testing Frequency
Annually
Evidence Archive Location
Insert hyperlink or location of evidence archive.
Control Stewards Process Narrative
Provide control steward commentary indicating the formal methodology in place.
Control Steward – Jane Manager
Process Illustration
Replace this test by inserting a process diagram, flowchart or other visual representation to illustrate the process narrative as necessary. Include a brief description of the process illustration.
Control Status and Auditors Commentary
The control is effective.
File:Greenlock.jpg
Status is acceptable.
Control Exception Commentary
Status is acceptable.
Remediation Plan
Remediation is not required at this time.